Topic: Single Girder Crane Installation Service Plan

Single Girder Crane Installation Preparation and Considerations

After Single Girder Crane for sale to the user’s site, check to verify whether the number of components are consistent, with defect or not, problem should be solved promptly.

When Single Girder Crane unloading and handling, should pay special attention to avoid the single girder crane affected by twisting, bending, impact and other accidents, hoisting should be through lifting holes (see Figure 9), edges and corners should be pad with underlay.

Single Girder Crane Hoisting Sketch
Figure 9 Single Girder Crane Hoisting Sketch

Single Girder Crane Bridge Assembly

Single Girder Crane main beam and end beam can be connected by split bolts, bolting connect before overall installation. (see Figure 10)

Single Girder Crane Main Girder and End Girder Connection

a. seat type structure                                 b. hanging structure
Figure 10   Single Girder Crane Main Girder and End Girder Connection
Single Girder Crane Installation and Erection Plan

Before the new plant covered roof, above the plant track has enough space, using mobile crane directly lift overall Single Girder Crane, when lift height over the rail top, use rope pulling to rotate the single girder crane, lay down the crane when wheel groove aligning track.

Single Girder Crane Installation Service Plan