Topic: These Operations Can Avoid The Bridge Crane From Causing Trouble In Th

1: When installing a bridge crane, it should be satisfied with the device requirements for the hoisting of its unit components. When there is a water inlet valve in the Crane factory building, the installation line between it should be placed within the working range of the crane's auxiliary hook.

2: The net spacing of the suspended ceiling of the bridge crane (or the bottom chord of the factory building frame, the bottom of the lamp) shall not be less than 200-300mm.

3: There should be a space for personnel to disassemble the reducer cover, drum, motor and other components of the bridge crane at the proper position on the top of the crane.

4: In addition to the distance between the two ends of the crane and the inner side of the wall, in addition to the requirements for the cart to travel, the device for the cart wheeling organization and the clearance and the direction of the vehicle for maintenance requirements should also be left in the appropriate position.

5: The width of the top surface of the installed crane beam should meet the requirements of the operators to pass, and there should be an escalator for the driver and maintenance personnel to go up and down the crane.

6: During the hoisting process, the component spacing of the equipment has been installed, the structure and the spacing on the ground should meet the requirements



These Operations Can Avoid The Bridge Crane From Causing Trouble In The Later Operation Process